The project has a construction area 30382 square meters, and adopts the double-sided heterotropic hyperbolic paraboloid shell mesh tube steel mesh tube at a plurality of diameters as the main load-bearing structure cylinders, buckling restrained braces system, steel buckling restrained energy wall, TMD damper and laminated rubber bearings, and uses many other new technologies and new processes.