
The project is located in Huaibei City, Anhui Province, with a construction area of 15431 square meters. It is a domestic waste incineration power generation project in Huaibei City. The boiler room in the main factory building adopts a grid column truss+spatial truss system, the steam turbine room adopts a reinforced concrete frame+light steel roof structure system, the unloading room adopts a reinforced concrete frame+spatial truss structure system, the garbage pit adopts a reinforced concrete frame+spatial pipe truss structure system, and the ramp sealing steel canopy adopts a reinforced concrete frame+light steel structure.