
The project is located in Guiyang City, Guizhou Province, with a total construction area of 60580 square meters. The Gui'an High speed Railway Station on the Shanghai Kunming Railway has three above ground floors and two underground floors. The ground floor is the station square level, including the exit hall, bus stop, long-distance bus stop, etc; The second floor above ground is the basic platform level, and the third floor above ground is the elevated waiting hall level; The basement level is the subway station hall, with social car parking lots, taxi parking lots, etc. on both sides; The second basement level is the basic platform level of the subway. The passenger flow is designed to be in and out, with four 450m × 12m × 1.25m passenger platforms and eight track lines (arrival and departure lines), including two main lines of the Shanghai Kunming Passenger Dedicated Line. The main structure of the station is mainly composed of station building engineering and platform canopy engineering, with a total steel consumption of 11885t and a maximum height of 32.4m for the station building.