中文/English
Domestic engineering
Bridge structure Current location:Home > Domestic engineering > Bridge structure

The "Sky Steps" Crystal Corridor Bridge

Date:2021/12/28 9:27:56 Popularity:247

The project is located at an altitude of 1096 meters on Xueling Peak in Yunshang Grassland, Anji County, Huzhou City. The structural form is a cantilever cable-stayed bridge, which extends 80.8 meters outward from the mountain and is built at a 90 degree angle to the cliff. The bridge deck is arranged in an "A" shape, with a channel width of 2.5 meters and a total length of 365 meters, using approximately 700 tons of steel.